Fairway Drive STP Improvement Phase III
This Federal-Aid Project improvement consisted of the construction of a bituminous roadway with curb & gutter and enclosed storm drainage system along a new alignment. The length was approximately 1.0 mile and reconstruction/resurfacing of existing Fairway Drive was an additional 0.3 mile.
Other items of work included brick paver sidewalks, bicycle path and landscaping.
About the Project
Client
Village of Vernon Hills
Construction Cost
$4.0 Million
Scope of Services
Resident Engineering
Construction Inspection
Construction Layout
Construction Documentation