Civiltech Engineering, Inc.

Fairway Drive STP Improvement Phase III

This Federal-Aid Project improvement consisted of the construction of a bituminous roadway with curb & gutter and enclosed storm drainage system along a new alignment. The length was approximately 1.0 mile and reconstruction/resurfacing of existing Fairway Drive was an additional 0.3 mile.

Other items of work included brick paver sidewalks, bicycle path and landscaping.